A
Interface control
We author and own the Interface Control Document: the mechanical, electrical, thermal, data, and software standard that separates the platform from the mission system. The OEM builds to it once.
Capabilities
A
We author and own the Interface Control Document: the mechanical, electrical, thermal, data, and software standard that separates the platform from the mission system. The OEM builds to it once.
B
We select and manage subsystem suppliers, integrate the kit as a single qualified configuration, and carry integration-level warranty and configuration control at production rate.
C
We deliver autonomy as a staged program: teleoperation, assisted, supervised, conditional. Each phase fixed-price, gated, and backed by a documented safety framework.
The A113 Mission Kit
01
Ruggedized on-vehicle compute. Disconnected, intermittent, low-bandwidth capable. Hosts all mission software.
02
Energy storage and microgrid interface. Silent watch, hot-swap, dynamic load balancing, chemistry-agnostic.
03
Retractable mast, mesh radio, satellite backhaul, private cellular. Beyond-line-of-sight and contested-spectrum capable.
04
Ground control station and operator interface. Teleoperation through conditional autonomy on one console.
05
Passive detection, tracking, and classification. Integrates with existing command systems rather than replacing them.
06
Sovereign, air-gapped AI stack under the A113 orchestration layer. No cloud dependency.
07
Thermal Deception Field — infrared and radio-frequency deception. Programmable emitters, DRFM transponders, vehicle-mounted and scatterable decoys. A113 proprietary.
See TDF — IR & RFAny module may be added, removed, or re-sourced without re-qualifying the platform.
Platform anatomy

A
Counter-UAS, EO/IR, GNSS.
B
Mesh, SATCOM, private cellular.
C
Ruggedized on-vehicle compute & mission software.
D
Microgrid interface, silent watch, hot-swap.
E
Thermal Deception Field (IR/RF). Vehicle-mounted & scatterable.
Delivery model
No cost escalation.
Clear outcomes.
Earn the next phase.
We stand behind it.
Next step
Six to eight weeks, fixed price. You receive the concept of operations, the Interface Control Document, the electrical and thermal budget against your actual platform, a safety framework, and a firm price for the build.
If the study does not earn the next phase, you have learned that for the cost of a study.
Request a scoping study